17.74.406    PERMIT AND OTHER PROJECT FEES

(1) The applicable fee, provided in (2) Table 1 and (3) Table 2, shall be submitted to the department with submittal of an asbestos project permit application, an annual asbestos project permit application, or a demolition notice.

 

(2) Table 1 - Permit Fees:

 

Permit Fee

Amount of Permit Fee

Asbestos project permit

Fees are calculated by AUMs using Table 2

Annual asbestos project permit, authorizes the removal or disturbance of up to 25,000 AUMs during the annual project permit period

$4,000

Annual asbestos project permit revision authorizes cumulative removal or disturbance that exceeds 25,000 AUMs

$700 plus AUM fees in Table 2 for regulated asbestos-containing material that exceeds 25,000 AUMs

Demolition notice

$100

Demolition revisions

$100

Project permit revision

$100 plus the additional AUM fees (If there is a change in the AUM range, a person would pay the difference between the two ranges in Table 2)

Emergency renovation notification

(ARM 17.74.352)

$300 plus AUM fees in Table 2

Submission of alternate work practice request (ARM 17.74.353)

$100

Voluntary registration for a non-regulated asbestos abatement project (as in (4))

$100 plus AUM fees in Table 2 if the project becomes regulated and exceeds 100 AUMs

Ordered demolition

$300

Transportation and disposal permit

$100


(3) Table 2 - AUM Fees:

 

AUM Range

AUM Fee Amount

up to 100

$100

101 to 300

$150

301 to 500

$200

501 to 750

$300

751 to 1,500

$600

1,501 to 3,000

$1,000

3,001 to 5,000

$2,000

5,001 to 10,000

$3,000

10,001 to 25,000

$4,000

25,001 to 50,000

$6,000

50,001 to 100,000

$8,000

100,001 or more

$16,000

 

(4) Abatement contractors may voluntarily register a non-regulated asbestos project on a department-approved form upon payment of the $100 voluntary registration fee in Table 1 at (2). If non-regulated materials are rendered regulated because of a voluntarily registered project, the abatement contractor shall notify the department and submit the appropriate fee for any disturbed regulated asbestos-containing material in accordance with Table 2 in (3).

(5) The total fee may not exceed $16,000 per asbestos project permit or annual asbestos project permit.

(6) For fee assessment, layered homogenous materials may be treated as one layer if a department-accredited asbestos inspector determines and documents the layered homogenous character of the material during an inspection conducted in accordance with ARM 17.74.354.

 

History: 75-2-503, MCA; IMP, 75-2-503, 75-2-504, MCA; NEW, 2020 MAR p. 1325, Eff. 7/1/20.