HOME    SEARCH    ABOUT US    CONTACT US    HELP   
           
Prev Next

36.22.1206    TUBING REQUIRED

All flowing oil wells shall be equipped with and produced through tubing, unless the well is a dual completion.

History: 82-11-111, MCA; IMP, 82-11-123, 82-11-124, MCA; Eff. 12/31/72.

Home  |   Search  |   About Us  |   Contact Us  |   Help  |   Disclaimer  |   Privacy & Security